Plans have been filed for 22 Caton Place with DOB and are under review. This is the property that was the site of the chalkboard and corkboard factory and which underwent the ULURP process in an attempt to upzone to R7A. Zoning of the property was granted at R7B in a compromise agreement (details elsewhere on this site). A complete report on the project can be downloaded here .
The text of the report includes unattributed copy from this website, written by me (Mandy), and includes information on our group's activities. It also has detailed floor plans of the building and data on the number and type of units. This photo rendering of the building came from the Empire Equities report; I borrow it without permission, but in the spirit of fair exchange of content.